1. What is a controlled decking zone (CDZ)? What are the requirements for working in a CDZ? Describe four duties of the controlling contractor on a steel erection site.

Your response should be at least 75 words in length.

2. Discuss some ways that employee exposure to overhead loads during steel erection can be reduced. When is working under a load permitted?

Your response should be at least 75 words in length.